SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018091026,Mt. San Antonio Community College,,,Mt. San Antonio College Transit Center,NOD,12/24/2018,12/24/2018,"The proposed project is divided into four project elements. The first element, a new transit center, involves the construction of a ten-bus bay transit center. The bus bays would be located around a central bus plaza and would accommodate pedestrian loading and unloading. Construction of the transit center would include other improvements including improvements to vehicular and non-vehicular circulation; landscape, hardscape, fencing, and lighting; and utility infrastructure. The second element, proposes improvements to Temple Ave including a traffic signal at the existing driveway on Temple Avenue. As part of the third element, the existing vehicular access southeast of Technology Center (Building 28A/B) and between the driveway from Lot D-2 and D-3 would be modified to prohibit vehicular movement. This would involve repaving and adding a series of bollards to restrict through vehicular movement. The last project element would expand the driveway and pedestrian circulation area at the existing driveway that connects the surface parking area to the Exercise Science/Wellness Center (Building 27A). Pool, Pool Building (Building 27B) and Physical Education Center (building 27C) to Modulars 18A through 18D.",https://ceqanet.opr.ca.gov/2018091026/2,Mt. San Antonio College Transit Center,Gary Nellesen,Mt. San Antonio Community College,N/A,,1100 N. Grand Avenue,,Walnut,CA,91789,9092845720,34°02'49.28"N 117°50'29.73"W,Walnut,Los Angeles,,Bonita Dr/Temple Ave,91789,1.8,,"I-10, SR 57",,,,,,,,,,,,,,Mt. San Antonio College Community College District ,Yes,12/12/2018,No,No,Yes,,No,,No,No,"Walnut Public Library - 21155 La Puente Ave., Walnut, CA 91789"