SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018078062,State Water Resources Control Board,,,Highway 395 High Pressure Looping on La Mesa Rd Project,NOE,7/3/2018,7/3/2018,The purpose of this project is to install an 8-inch steel gas main line by open trench within the La Mesa Rd right-of-way between Baldy mesa rd and Highway 395. This project benefits Southwest Gas and their customers.,https://ceqanet.opr.ca.gov/2018078062,Highway 395 High Pressure Looping on La Mesa Rd Project,Brendan Reed,State Water Resources Control Board,N/A,,1001 I Street,,Sacramento,CA,95814,9163415462,34.484847°'"N 117.424786°'"W,Victorville,San Bernardino,,La Mesa Rd between Baldy Mesa Rd and Highway 395,,,,,,,,,,,,,,,Categorical Exemption,S: 15304,"Project consists of minor alterations to the condition of the land. Specifically, the project will entail minor trenching and backfilling where the surface is restored to pre-project conditions. There will be no removal of mature vegetation and the project is taking place within a previously disturbed road prism.",,,,,,,,,,,,