SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018062071,"Santa Cruz, City of",City of Santa Cruz,,Addendum to Certified Environmental Impact Report Newell Creek Dam Inlet/Outlet Replacement Project,ADM,6/10/2021,,The proposed Project modifications consist of a change to the maximum discharge rate of the outlet structure with a control to be installed on the new outlet discharge sleeve valve to provide a revised maximum emergency release rate of 203 cubic feet per second (cfs). This represents an increase of approximately 39 cfs above the maximum emergency release rate of 164 cfs that was evaluated in the EIR. The change is necessary to allow the valve to initially facilitate releases greater than the required emergency release in order for the facility to continue to meet drawdown requirements even with some anticipated diminished capacity as the facility ages.,https://ceqanet.opr.ca.gov/2018062071/7,Addendum to Certified Environmental Impact Report Newell Creek Dam Inlet/Outlet Replacement Project,Sarah Easley Perez,Principal Planner,N/A,seasleyperez@cityofsantacruz.com,212 Locust Street; Suite C,,Santa Cruz,CA,95060,8314205327,90°0'0"N 90°0'0"W,Santa Cruz,Santa Cruz,,Newell Creek Road,95018,518,076-251-24,9,"Newell Creek, Loch Lomond Reservoir",,No,6/10/2021,6/24/2021,Water Facilities,,"Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Noise, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,