SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018058438,Capistrano Unified School District,,CUSD,Aliso Niguel High School Solar Energy Project,NOE,5/22/2018,5/22/2018,"The District plans to install solar energy panels atop 18 canopies on existing parking lots on the west side of the campus. The installation would require removal of some light poles and ornamental trees within those parking areas. Approx. 770 feet of wiring would be installed in trenches and boorings to connect the arrays to a utility meter in the east-central part of the campus. The capacity of the system would be about 900 kW AC. No increases in enrollment, capacity or intensity of uses are proposed as part of this project. The project would be installed per Division of the State Architect (DSA) approved design specifications. The project would be executed per appropriate and current District standards, guidelines and construction Best Management Practices (BMPs). The new solar structures would serve as campus improvements, and a such, the beneficiaries of the project include the schools student, faculty, staff and taxpayer/members of the community. ",https://ceqanet.opr.ca.gov/2018058438,Aliso Niguel High School Solar Energy Project,John Forney,Capistrano Unified School District,N/A,,33122 Valle Road,,San Juan Capistrano,CA,92675,9492349543,,,Orange,,28000 Wolverine Way,,,,,,,,,,,,,,,Statutory Exemption,S:21080.35,Solar energy systems installed on the roof of an existing building or on an existing parking lot are statutorily exempt from CEQA.,,,,,,,,,,,,