SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018058221,Carmichael Water District,,,CWD Infiltration Caisson Flood Damage Repair,NOE,5/14/2018,5/14/2018,"Flood damage repairs associated with 2017 high river flows. Purpose is to restore rock rip-rap protection to collectors 1, 2 and 3. Beneficiaries are the rate players of the Carmichael Water District through maintained water supply reliability, mitigation of potential future erosion damage and prudent repair of existing assets.",https://ceqanet.opr.ca.gov/2018058221,CWD Infiltration Caisson Flood Damage Repair,Mark McClintock,Carmichael Water District,N/A,,7837 Fair Oaks Boulevard,,Carmichael,CA,95608,9166790457,,Rancho Cordova,Sacramento,,,,,,,,,,,,,,,,,Categorical Exemption,15303 1d,This project is the restoration of nominal flood damage to existing a public water supply utility asset critical to the reliability of public drinking water for the community. This work will result in no expansion of the existing use or capacity of the utility asset. The district considers this work as prudent maintenance to restore minor damage from high river releases in 2017 and to protect from more severe future damage if left unattended.,,,,,,,,,,,,