SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018052025,Santa Clara Valley Water District,,,Uvas Creek Levee Rehabilitation Project,NOD,7/17/2018,7/17/2018,"Project would consist of inboard and outboard side slope reconstruction along approx. 4,200 linear feet of the levee. An additional 350 linear feet of reconstruction would occur to the outboard embankment. The levee side slope reconstruction would first require knowing the existing grasses to reduce the organic content followed by excavation and benching of the levee. Upon completion of the excavation activities, rebuilding the levee would consist of placing the excavated material in compacted layers. Erosion control matting would be embedded within the rebuilt levee slope and covered with additional fill material until as-built grades are achieved. The rebuilt levee surface would be hydroseeded with a native seed to promote the establishment of grasses. Resurfacing of the existing asphalt pedestrian trail and maintenance road atop the levee would be undertaken to repair damage, if any, from construction equipment.",https://ceqanet.opr.ca.gov/2018052025/2,Uvas Creek Levee Rehabilitation Project,Tim Tidwell,Santa Clara Valley Water District,N/A,,5750 Almaden Expressway,,San Jose,CA,95818,4086303003,36°59'33.1"N 121°34'28.9"W,Gilroy,Santa Clara,,West Luchessa Ave and Princevalle St,95020,11,,"101, 152","Uvas Creek, Princevalle Drain",,,,,,,,,,,,,Santa Clara Valley Water District ,Yes,7/10/2018,No,No,Yes,,No,,No,Yes,"5750 Almaden Expressway, San Jose, CA 95118"