SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018051028,Fresno County,,,Reedley Main Canal Bridge Replacement - Initial Study No. 7321,NOD,12/28/2020,12/28/2020,"Replacement of an existing two-lane, concrete-slab bridge with a two-lane box culvert bridge. The proposed bridge is fifty-seven feet long and fifty-five feet wide with two twelve-foot travel lanes and two four-foot-wide shoulders. It will replace a twenty-nine-foot-long and nineteen-foot-wide bridge with nine-foot travel lanes, and no shoulders. 285 feet of the existing road north of the bridge and 158 feet south of the bridge will be improved and taper widened, and up to 10 feet of additional right-of-way may be acquired on either side of the project area. Overhead utilities will be relocated, and additional utility facilities such as guy-wires, anchors, and poles may be installed in or near the project area. A coffer dam will be built for construction purposes, channel work will occur, and four orange trees and ruderal vegetation in the existing right-of-way will be removed.",https://ceqanet.opr.ca.gov/2018051028/4,Reedley Main Canal Bridge Replacement - Initial Study No. 7321 (Recirculated),David Randall,Fresno County Department of Public Works and Planning,N/A,DRandall@FresnoCountyCA.gov,"2220 Tulare Street, 6th Floor",,Fresno,CA,93721,5596004052,,,Fresno,,"Englehart Avenue, approximately 0.3 miles north of its intersection with American Avenue",93654,,,,Reedley Main Canal,Reedley Municipal Airport,,,,,,,,,,,,Fresno County Board of Supervisors,Yes,12/15/2020,No,No,Yes,,Yes,Yes,No,Yes,"2220 Tulare Street, Suite A, Fresno, CA 93721"