SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018051028,Fresno County,,,Reedley Main Canal Bridge Replacement,MND,5/16/2018,,"The subject application proposes to replace an existing two-lane, concrete-slab bridge with a two-lane box culvert bridge. The proposed bridge is 57 ft long and 55 ft wide with 2 12-ft travel lanes and 2 4-ft wide shoulders. It will replace a 29 ft long and 19 ft wide bridge with 9-ft travel lanes, and no shoulders. 285 ft of the existing road north of the bridge and 158 ft south of the bridge will be improved and taper widened, and up to 10 ft of additional ROW may be acquired on either side of the project area. Overhead utilities will be relocated, and additional utility facilities such as guy wires, anchors, and poles may be installed in or near the project area. A coffer dam will be built for construction purposes, channel work will occur, and four orange trees and ruderal vegetation in the existing ROW will be removed. The project site is located on Englehart Ave, approx 0.3 mi north of the intersection of Englehart Ave and American Ave in Fresno County.",https://ceqanet.opr.ca.gov/2018051028,Reedley Main Canal Bridge Replacement - Initial Study No. 7321 (Recirculated),Danielle Crider,Fresno County,N/A,,"2220 Tulare Street, 6th Floor",,Fresno,CA,93721,5596009669,36°39'44.9"N 119°24'45.3"W,Reedley,Fresno,,American Ave and Englehart Ave,93654,,,,Reedley Main Canal,Reedley Municipal Airport,No,5/16/2018,6/14/2018,Transportation,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,