SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018038630,San Diego Unified Port District,,,Searles Valley Tail Tie Replacement at Shiploader Berth 10-7,NOE,3/28/2018,3/28/2018,"The proposed project involves the removal and replacement of approximately 392 rail ties and associated pavement adjacent to the traveling shiploader structure at Berth 10-7 on the Tenth Avenue Marine Terminal (TAMT) in the City of San Diego. Currently, the traveling shiploader structure travels on an existing rail system along Berth 10-7. The existing rail system is supported by wooden rail ties and asphalt concrete (AC) pavement, of which the wooden rail ties have deteriorated beyond repair. For continues safety and operation of the rail system, the proposed project would involve removal of the existing 392 wooden rail ties and AC pavement and replacement with new wooden rail ties and pavement. Removal of 1,135 square feet of AC pavement adjacent to existing rail system. Removal 392 wooden rail ties (each rail tie is 6 inches high by 9 inches wide by 6 feet long) along approx. 448.5 linear feet of rail. Installation of 1,135 square feet of pavement adjacent to existing rail system (800 square feet of Portland Concrete (PC) pavement and 335 square feet of AC pavement. Installation of 392 wooden rail ties along approximately 448.5 linear feet of rail.",https://ceqanet.opr.ca.gov/2018038630,Searles Valley Tail Tie Replacement at Shiploader Berth 10-7,Kelly Czechowski,San Diego Unified Port District,N/A,,Development Services Department,3165 Pacific Highway,San Diego,CA,92101,6196867213,,San Diego,San Diego,,1800 Crosby Rd,92101,,,,,,,,,,,,,,Categorical Exemption,"S: 15301,15302","Consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing. Replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site and will have",,,,,,,,,,,,