SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018038547,Fish & Wildlife 2 (Rancho Cordova),"California Department of Fish and Wildlife, Region 2",CDFW,Mill Creek Diversion Structure Removal Project (Lake or Streambed Alteration Agreement No. 1600-2017-0401-R2),NOE,3/23/2018,3/23/2018,"CDFW has executed Lake or Streambed Alteration Agreement No. 1600-2017-0401-R2, pursuant to section 1602 of the Fish and Game Code to the El Dorado Irrigation District. The project is limited to the removal of the existing 17-ft long by 18 in wide reinforced concrete Mill Creek diversion structure including metal structures with the slide gate and outlet pipe, and demolition of portions of the associated concrete diversion dam. The diversion structure will be dismantled and removed using hand tools such as sledge hammers, picks, breaker bars, and shovels, and power tools such as a demolition hammer, a grinder, and a dry concrete power cutting saw. Structural rebar embedded within the diversion dam wing walls and any other metal structures that cannot be fully dismantled will be cut flush with the surrounding parent surfaces using power tools or a cutting torch. Work will take place in late summer or early fall, when flows in Mill Creek are minimal. Prior to removing the diversion structure, flows will be routed around the construction area by constructing a temporary sandbag cofferdam upstream of the work area and diverting flows through a six to eight in bypass pipe, which will outlet downstream of the work area. ",https://ceqanet.opr.ca.gov/2018038547,Mill Creek Diversion Structure Removal Project (Lake or Streambed Alteration Agreement No. 1600-2017-0401-R2),Gabriele Quillman,"California Department of Fish and Wildlife, Region 2",N/A,,Northern Central Region,"1701 Nimbus Road, Suite A",Rancho Cordova,CA,95670,9163582955,,,El Dorado,,,,,,,,,,,,,,,,,Categorical Exemption,15304,"The project is exempt under class 4 b/c it consists of a minor alteration to the condition of a stream and will not remove any mature, healthy, scenic trees.",,,,,,,,,,,,