SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018032039,"Toxic Substances Control, Department of",Department of Toxic Substances Control,,NP Oakley Facility Building 5 Area Cleanup,NOD,5/26/2022,5/26/2022,"The Department of Toxic Substances Control (DTSC) has prepared the Corrective Measures Decision (CMD) for Building 5 Area Cleanup at the NP Oakley Facility. The CMD summarizes previous investigations and the remedy that was presented in the Corrective Measures Proposal (CMP), which was previously issued for public comment. The CMD selected cleanup measures that are required to protect human health and the environment, and to address subsurface contamination in the Building 5 Area. The Building 5 Area was contaminated by NorthPoint’s release of partially treated groundwater to the Building 5 infiltration area. DTSC’s selected remedy for the Building 5 Area includes the following elements: 1. Interim time-critical soil removal (already completed) 2. Long-Term Groundwater monitoring 3. Building 5 Sub-slab vapor intrusion mitigation system (VIMS) 4. Land Use Controls",https://ceqanet.opr.ca.gov/2018032039/6,"Chemours Oakley Site Sediment, Soil and Groundwater Corrective Measure Studies",Katherine Henry,Department of Toxic Substances Control,Project Manager ,Katherine.Henry@dtsc.ca.gov,8800 Cal Center Drive,,Sacramento ,CA,95814,5105892981,,Oakley,Contra Costa,,,,,,,,,,,,,,,,,,,,Department of Toxic Substances Control,Yes,5/25/2022,No,No,No,Mitigated Negative Declaration Addendum ,Yes,Yes,No,Yes,https://www.envirostor.dtsc.ca.gov/public/profile_report.asp?global_id=60003207