SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018028082,State Water Resources Control Board,,,"Operation of California Water Company - Tulco 1,2,3 Trichloropropane Wellhead Treatment (TCP-TUL-201-02)",NOE,2/6/2018,2/6/2018,"The State Water Resources Control Board as the lead agency will be issuing a water supply permit. California Water Service Company - Tulco will remove two granulated activated carbon tanks and install two 8-foot diameter 16.76 foot high vessels on an existing concrete pad to treat TCP. Less than 500 feet of piping will be installed to connect the treatment tanks to the system, for analysis, and discharge. old piping that connected the GAC tanks to the system will also be removed. two sample stations, a nitrate analyzer, and a 30 inchdrainsump will also be installed. A meter will also be replaced. The constructiction will occur on an approximately 9,148 square feet fenced existing well site. The project will provide for the operation of the system.",https://ceqanet.opr.ca.gov/2018028082,"Operation of California Water Company - Tulco 1,2,3 Trichloropropane Wellhead Treatment (TCP-TUL-201-02)",Tricia Wathen,State Water Resources Control Board,N/A,,Visalia District Office,"265 W. Bullard Ave, Suite 100",Fresno,CA,93704,5594473300,,Visalia,Tulare,,Avenue 226 and Road 130,,,,,,,,,,,,,,,Categorical Exemption,"S: 15301, title 22, S: 60101","The removal of the old tanks, piping, and meter includes minor alteration to existing investor owned utilities. The installation of the treatment tanks, piping, sample stations, mitrate analyzer, drain sump, and meter include additions to existing structures provided that the addition will not result in an increase of more than 10,000 square feet in an area where all public services and facilities are available that allows for maximum development by the General Plan.",,,,,,,,,,,,