SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017128338,Long Beach Unified School District,,,Lowell Elementary School HVAC Project,NOE,12/13/2017,12/13/2017,"LBUSD proposes campus improvements to Rogers MS, which includes the installation of: new HVAC systems with a new instrumentation and controls system, upgraded electrical systems, ADA-compliant access improvements, new drop ceilings in various classrooms, a campus wide fire alarm, digital intercom/clock and bell system upgraded, and the replacement of the turf play field with synthetic turf. Other improvements to the buildings receiving the HVAC upgrade include: new LED light fixtures and power outlets, new Extron AV systems, and new floor and paint finishes. The proposed project only involves the renovation of existing buildings and limited site work related to modifying ramps and pavement for ADA compliance. The project would have no effect on the capacity of the school. Construction activities are anticipated to start in June 2018, and the overall construction duration is anticipated to last approx. 12 months. The project would benefit the staff and students at the school.",https://ceqanet.opr.ca.gov/2017128338,Lowell Elementary School HVAC Project,Alan Reising,Long Beach Unified School District,N/A,,2425 Webster Avenue,,Long Beach,CA,90810,5629977550,,,,,,,,,,,,,,,,,,,,Categorical Exemption,"15301c1, 15302c2","The proposed project consists of repairs, upgrades and minor alteration of existing buildings to provide HVAC system; fire, life, safety; floor and paint finishes; ceilings, and accessibility improvements. The project does not increase student capacity of the school and does not increase the sf of the building. The project would remove the HVAC systems in buildings A, B, C and D and replace with a new system. Also the project would replace the existing turf field synthetic turf. All upgraded buildings and the field on the campus will have the same purpose and capacity as the currently conditions. ",,,,,,,,,,,,