SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017128147,State Water Resources Control Board,,,"Operation of California Water Service Company-Bakersfield, 1,2,3 trichloropropane (TCP) Wellhead Treatment (Site Bk-135-01)",NOE,12/5/2017,12/5/2017,"SWRCB as the lead agency will be issuing a water supply permit. CA Water Service Company- Bakersfield will install 4 12-foot diameter, 20 foot tall vessels (2 sets of vessels in series) to treat TCP. Approx. 187 foot of 8-inch piping will be installed to connect the treatment tanks to the system. Associated wiring will also be installed. Approx. 73 feet of 8-inch discharge piping and a concrete splash block with 6-inch curbs on 3 sides will also be installed. Discharge will drain to the city's storm water system. An existing chemical enclosure will be moved to allow for the installation of the new piping and an existing fence will be moved to the property line. The construction will occur on an existing 6,969 ft fenced well site surrounded by urban development. The project will provide for the operation of the system.",https://ceqanet.opr.ca.gov/2017128147,"Operation of California Water Service Company-Bakersfield, 1,2,3 trichloropropane (TCP) Wellhead Treatment (Site Bk-135-01)",Tricia Wathen,State Water Resources Control Board,N/A,,"265 W. Bullard Avenue, Suite 101",,Fresno,CA,93704,5594473300,,Bakersfield,Kern,,East Belle Terrace and Madison Ave.,,,,,,,,,,,,,,,Categorical Exemption,"S:15301,15302,15303, Class 1,2,3","Existing Facilities. Replacement or Reconstruction. New Construction or Conversion of Small Structures.",,,,,,,,,,,,