SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017121031,Cawelo Water District,,,Famoso Basin Pipeline Project,MND,12/12/2017,,"Cawelo Water District proposes to install a pipeline to help eliminate water lost from seepage from unlined canals. Construction activities associated with the proposed project involve the installation of a 1.8-mile long, 36-in diameter, bi-directional, intertie pipeline to replace the use of 2.4 miles of unlined canals. The bi-directional pipeline would connect to the Friant-Kern Canal approx a half mile south of SR 46, and run 1.8 miles in an easterly direction within an existing dirt road until it reaches the Lerdo Canal. The turnout at the Friant-Kern would be installed when the canal is down for maintenance or using a cofferdam. The turnout pipe size would be a 54-in diameter pipe within the concrete embankment. Adjacent to the FKC ROW, CWD would construct an electric pumping plant that would pump water at 45 cubic feet per second.",https://ceqanet.opr.ca.gov/2017121031,Famoso Basin Pipeline Project,David Ansolabehere,Cawelo Water District,N/A,,17207 Industrial Farm Road,,Bakersfield,CA,93308-9519,6613936072,35°35'40.6"N 119°13'26.1"W,Wasco,Kern,,"HWY 99, 46",,,MULT,"99, 46",Poso Creek,,No,12/12/2017,1/10/2018,Water Facilities,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Geology/Soils, Hydrology/Water Quality, Noise, Vegetation",,,,,,,,,,,,,,,,,