SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017118305,State Water Resources Control Board,,,Operation of Well 16 Temporary Granular Activated Carbon (GAC) Treatment System,NOE,11/17/2017,11/17/2017,"The State Water resources Control Board (State Water Board), as the responsible agency, will be issuing a water supply permit. The City of Chino proposed project is for one treatment system that includes four skid-mounted pre-filters and two Granular Activated Carbon (GAC) Treatment Vessels and piping to an existing treatment facility. The pre-filter unit is 10 ft x 15 ft and installed above ground with no permanent foundation. Vessels will be installed on a 17 ft x 38 ft concrete pad. New 8 inch distribution piping will be installed for GAC treatment system influent (raw-untreated), effluent (treated), and backwash supply 9approx. 230 ft totals). The GAC Treatment System will utilize GAC material that will need to be removed from the vessels every 1-3 years (varied based on water quality) and transported (non-hazardous) to an off-site locations to be reactivated for reuse. The Project proposes a shallow excavation to install concrete pad for the GAC Treatment Systems. No permanent grading is proposed outside project and any areas disturbed during construction will be restored to its original condition. Total disturbed area is estimated to be approximately <1,000 square feet.",https://ceqanet.opr.ca.gov/2017118305,Operation of Well 16 Temporary Granular Activated Carbon (GAC) Treatment System,Eric Zuniga,State Water Resources Control Board,N/A,,San Bernardino District Office,"464 West 4th Street, Suite 437",San Bernardino,CA,94201,9093834328,,"Chino, Ontario",San Bernardino,,"Bon View Avenue, Scharfer Avenue, Benson Avenue, Francis Avenue",,,,,,,,,,,,,,,Categorical Exemption,"Class 1 - S: 15301, S: 60101",The project consists of exterior alterations of water treatment units (14 CCR 15301 and 22 CCR 60101(a)(1)) with no expansion of an existing use. The State Water Board is a responsible agency for this project and is not responsible for the California Department of Fish and Wildlife filing fees.,,,,,,,,,,,,