SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017098195,"Parks and Recreation, Department of",California Department of Parks and Recreation,,Heber Spetic Leach Lines Repair,NOE,9/12/2017,9/12/2017,"The purpose of this project is to replace the root-bound leach lines for the Heber Dunes residence, camp host sites, the old office building, and the new office/shop building septioc systems. The project entails exacavting and removing the existing infiltrator lines (setting the spoils to the side for re-use) and then smoothing the exposed ground surface, installing new infiltrators in their place, before covering them with drain rock and an additional layer of biofilter fabric and finally wrapping the sides of the trench fabric over the top. Then the trenches will get filled back up with the spoils that were exacavted from that site. The anticipated area of impact would measure approximately 150' (L) by 30' (W) with depths measuring up to 6' deep at each location. The excavation work is expected to be done using a backhoe tractor amd the placement of the infiltrators will be done by hand. repairs to each individual system will be completed to 90% before the next system will be taken off-line. this will serve to minimize the exposed trench areas and reduce the septic systems down-time from operation during the course the project. The 10% reminaing will be the final handwork to get rid of heavy equipment and the installation of carsonite markers to delineate and protect the leach zones from vehicle traffic.",https://ceqanet.opr.ca.gov/2017098195,Heber Spetic Leach Lines Repair,Dan Canfield,California Department of Parks and Recreation,N/A,,Off-Highway Motor Vehicle Recreation Division,"1725 23rd Street, Suite 200",Sacramento,CA,95816,9163241574,,Holtville,Imperial,,,,,,,,,,,,,,,,,Categorical Exemption,15301(b),Repair and maintenance of an existing facility,,,,,,,,,,,,