SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017091038,Fresno County,,,Environmental Impact Report No. 7257 Fifth Standard Solar Project Complex,NOD,11/10/2020,11/10/2020," Environmental Impact Report No. 7257 for the Fifth Standard Solar Project Complex permitted by Conditional Use permits 3562, 3563, and 3564. Which allows the construction, operation, maintenance, and ultimate decommissioning of a 150-megawatt (MW) solar photovoltaic (PV) generation facility, an up to 20-MW solar PV generation facility, and an up to 100-MW energy storage facility and associated infrastructure. The proposed project is located on twelve contiguous parcels, totaling approximately 1,600 acres in unincorporated Fresno County. A new generation-tie (gen-tie) line would be constructed to connect the solar and storage components of the proposed project to Pacific Gas and Electric’s (PG&E’s) adjacent Gates Substation (point of interconnect). The anticipated lifetime of the proposed project would be 35 years and would be decommissioned once operations of the facility cease. ",https://ceqanet.opr.ca.gov/2017091038/3,Fifth Standard Solar Project Complex Environmental Impact Report No. 7257,David Randall,County Of Fresno,N/A,drandall@Fresnocountyca.gov,2220Tulare Street,"Suite A, Street Level",Fresno,CA,93721,5596004052,,,Fresno,,"west side of State Route 269 (Lassen Avenue), between Gale Avenue and Jayne Avenue",,,"APNs: 075-060-15s, 075-060-52s, 075-070-01s, 075-070-32s, 075-070-33s, 075-070-34s, 075-070-35s,",SR 269,,,,,,,,,,,,,,County of fresno,Yes,11/6/2020,No,Yes,No,,Yes,Yes,Yes,Yes,"220 Tulare Street, Suite A Street Level, Fresno CA 93721"