SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017089001,Idyllwild Water District,,,Operation of the Idyllwild Water District Toll Gate Tank and Water Pipeline,NOD,8/7/2017,8/7/2017,"SWRCB, as the responsible agency, will be issuing a water supply permit. The Idyllwild Water District constructed a 46-foot wide, 30-foot high, gravity-fed 300,000 gallon welded steel tank and installed fencing within a 100-foot by 100-foot area. The Idyllwild Water District connected 2,000 feet of 8-inch diameter PVC, C-900 piping from the tank to the distribution system. The piping was installed within the existing width of the roadway that provides access to the site, plus a strip of 10 feet on each side. The project started construction on Aug. 29, 2013 and completed construction by July 22, 2014. Construction of the project involved less than 1 acre of land. The tank has been in use since 2014. The project will provide the continued operation of these facilities.",https://ceqanet.opr.ca.gov/2017089001,Operation of the Idyllwild Water District Toll Gate Tank and Water Pipeline,Steve Williams,State Water Resources Control Board,N/A,,1350 Front St.,,San Diego,CA,92101,6195254159,,,Riverside,,,,,,,,,,,,,,,,,,,,SWRCB ,No,8/2/2017,No,No,Yes,,No,,No,Yes,"1350 Front St., San Diego, CA 92101"