SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017088486,State Water Resources Control Board,,,Temporary Water Right Permit for Pine Flat Dam,NOE,8/22/2017,8/22/2017,"Temporary water right permit to divert water from the Pine Flat Lake. Water will be diverted through the Pine Flat Power Plant located at Pine Flat Dam at a rate of 7,900 cubic feet per second with a limit of 400,000 acre-feet. Diverted water will be used to generate hydropower. The permit will expire on January 1, 2018.",https://ceqanet.opr.ca.gov/2017088486,Temporary Water Right Permit for Pine Flat Dam,Mitchell Moody,State Water Resources Control Board,N/A,,Division of Water Rights,P.O. Box 2000,Sacramento,CA,95812-2000,9163415383,,Fresno,Fresno,,,,,,,"Pint Flat Dam, Power Plant, Kings River",,,,,,,,,,Other,,This permit does not have the potential for direct physical change or a reasonably foreseeable indirect physical change in the environment; therefore it does not meet CEQA's definition of a project. This permit does not have the potential for causing a significant effect on the environment and is not subject to CEQA.,,,,,,,,,,,,