SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017088399,"Mount Shasta, City of",City of Mount Shasta,,Mt. Shasta Sewer Interceptor Geotechnical Investigation,NOE,8/18/2017,8/18/2017,"The City is in the process of designing improvements to a section of the City's sewer interceptor. In order to determine the best alternative for the pipeline route, a geotechnical investigation is required. The Project entails excavation of 15 bore holes adjacent to the existing sewer line corridor. One bore hole will occur within waters of the U.S. This bore hole will be approximately 6 to 9 inches wide and approximately 10 feet deep. The remaining 14 holes will be excavated in uplands and will range in depth between 7 and 20 feet. Construction of the sewer interceptor is not part of this Project. The Project site will be accessed from Interstate 5 to the east, which was determined by the Project engineer to have the least impact to wetlands.",https://ceqanet.opr.ca.gov/2017088399,Mt. Shasta Sewer Interceptor Geotechnical Investigation,Rod Bryan,City of Mount Shasta,N/A,,305 N. Mount Shasta Boulevard,,Mount Shasta,CA,96067,5309267526,,Mount Shasta,Siskiyou,,,,,,,,,,,,,,,,,Ministerial,21080(b) (1)," Where the law requires a governmental agency to act on a project in a set way without allowing the agency to use its own judgement, the project is called ministerial. Discretionary project. ",,,,,,,,,,,,