SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017082090,Reclamation District No. 900,Reclamation Distirct No. 900,,Bridgeway Lakes Drainage Pipeline Project,MND,8/30/2017,,"The proposed project will involve construction of a stormwater drain pipeline, varying in diameter from between 24"" and 54"", extending from the stormwater detention basin in the north of the project area approx 11,700 ft to the south. The construction will take place parallel to the existing Bridgeway Lakes Drainage Ditch. The new stormwater pipeline is necessary due to sloughing, debris, and sediment build-up in the Bridgeway Lakes Drainage Ditch that occurred during the flood events of the past winter. The least environmentally damaging alternative is to construct the pipeline versus excavation and re-constructing the damaged areas within the Bridgeway Lakes Drainage Ditch. Construction of the pipeline will avoid impacts to seasonal wetland habitats while providing efficient stormwater and flood protection.",https://ceqanet.opr.ca.gov/2017082090,Bridgeway Lakes Drainage Pipeline Project,Kenric Jameson,Reclamation Distirct No. 900,N/A,,1420 Merkley Avenue,P.O. Box 673,West Sacramento,CA,95691,9163711483,38°32'06"N 121°34'53"W,West Sacramento,Yolo,,Marshall Rd and Bridgeway Lakes Drainage Ditch,95691,13.4,multiple,,Sacramento Deep Water Channel,,Yes,8/30/2017,9/28/2017,Other,,"Air Quality, Biological Resources, Cultural Resources, Hazards & Hazardous Materials, Noise",,,,,,,,,,,,,,,,,