SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017082064,"Etna, City of",City of Etna,,City of Etna Public Water System Improvement Project,ADM,8/10/2022,,"The original project addressed improvements to the City of Etna’s Water Treatment Plant (WTP), including installing ±350 feet of 8- and 12-inch pipeline, and constructing a new ±200,000-gallon water tank, ±382 square-foot filtration building, and a ±1,500 square-foot backwash pond. To date, the water tank has been constructed using Community Development Block Grant funding. The City is now proposing to complete the remaining WTP improvements with revisions and to complete additional improvements to the City’s water distribution system; these revisions and additional improvements are addressed in the Addendum. Revisions to the WTP improvements include increasing the size of the new filtration building and converting Reservoir 1 to backwash storage instead of constructing a new backwash pond. Other improvements at the WTP include remodeling the existing WTP building, installing a new 138,000-gallon water tank, installing a new sewer main for backwash discharge, installing a new backup generator, updating the SCADA system, and installing a solar photovoltaic system. Additional improvements to the water system include replacing ±408 water meters throughout the City; upsizing and replacing ±1,076 linear feet of waterlines; and installing ±1,364 linear feet of new water mains to close loops in the system.",https://ceqanet.opr.ca.gov/2017082064/2,City of Etna Public Water System Improvement Project,Dan Burbank,City of Etna,Director of Public Works,d.burbank@etnaca.com,442 Main Street,,Etna,CA,96027,5304675256,41°27'24.5"N 122°53'41.1"W,Etna,Siskiyou,,Various,96027,4,Various,3,"Johnson Creek, Etna Creek",None,No,,,Water Facilities,Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,