SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017081067,Tulare City Schools,,,"Operation of City of Tulare - Water Well 46 (Replacement to Well Seven and Well Nine), Two Two- Million Gallon Storage Tanks, and Related Improvements Project",NOD,6/17/2019,6/17/2019,"DESCRIPTION: Site 1: A 1,400 gallon well, Well 46, was drilled to replace Well Seven, a 425 gpm well and Well Nine, a 1,235 gpm well. A 33-foot tall, two-million•gallon tank was constructed. A 312-foot2 booster pump station, a 384-foot2 electrical and chemical building, and a 90 foot2 emergency generator was installed. Three catch basins and three storm drains were installed. A driveway, six-foot high chain link fence with privacy slats and barbed wire, and a 20-foot rolling gate was also installed. Landscaping was planted around the site. less than one mile of piping was installed to connect the components to each other, to the rest of the system, and for storm drainage. Site 2: A two-million-gallon tank was constructed. An 825 foot2 electrical and chemical storage building, a 640 ft2 booster pump station. and a 90 foot2 emergency generator was installed. Three catch basins, a fire hydrant, a 20-foot wide paved access road, and landscaping was also installed. less than one mile of piping was installed to connect the components to each other, to the rest of the system, and for stormwater drainage. Site 3 and 4: Well Seven and Well Nine were decommissioned. The Project will provide for the operation of the system.",https://ceqanet.opr.ca.gov/2017081067/2,"Replacement Water Wells, Storage tanks & Related Improvements",Chad Fischer,State Water Resources Control Board Tulare District,N/A,,"265 West Bullard Avenue, Suite 101",,Fresno,CA,93704,5594473300,,Tulare,Tulare,,,,,,,,,,,,,,,,,,,,State Water Board,No,6/12/2019,No,No,Yes,,No,No,No,Yes,"This is to certify that the record of permit issuance for the Project is available to the general public at the State Water Board, Division of Drinking Water District Office noted above. The MND is available from the lead agency."