SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017072049,"Public Utilities Commission, California",California Public Utilities Commission,CPUC,Fulton-Fitch Mountain Reconductoring Project (Project),MND,6/10/2019,,"Note: Review Per Lead The Final Initial Study/Mitigated Negative Declaration (IS/MND) of the Project was adopted in 2017 by California Public Utilities Commission (CPUC). This Supplemental IS/MND analyzes proposed changes to the Project since the CPUC adopted the Final IS/MND in 2017. Following the CPUC's approval of the Project, PG&E identified corrosion on the cross-arms of tubular steel poles (TSPs) in the Southern Segment of the Project that could potentially cause cross-arm failure during reconductoring activities. To address the risk of cross-arm failure, PG&E proposes to replace 21 existing TSPs in the Southern Segment of the Project that support the Fulton-Hopland 60-kilovolt (kV) Power Line, Geysers #12-Fulton 230-kV Transmission Line, and Geysers #17-Fulton 230-kV Transmission Line, rather than reconductoring on the existing TSPs as stated in the 2017 Final IS/MND.",https://ceqanet.opr.ca.gov/2017072049/3,Fulton-Fitch Mountain Reconductoring Project (Project),Lisa Orsaba,California Public Utilities Commission (CPUC),N/A,,505 Van Ness Avenue,,San Francisco,CA,92069,4157031966,38°30'27.36"N 122°45'37.52"W,,Sonoma,,"US 101, Lavell Road, and Old Redwood Highway",,,,US 101,Mark West Creek,Sonoma County Arpt,Yes,6/10/2019,7/15/2019,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Tribal Cultural Resources, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,