SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017072014,"Livermore, City of",City of Livermore,,Dalton Reservoir Replacement Project (Project No. CIP 2016-19),MND,7/10/2017,,"The proposed project would replace the existing 2.0 million gallon steel water reservoir with a new 3.41 MG steel reservoir on a 5.7-acre site. The project location is 2889 Ames St, Livermore, approx 1,400 ft west of North Vasco Rd and about 1,000 ft northeast of the eastern terminus of Raymond Rd, in the northeastern part of the city of Livermore. The existing reservoir is welded steel and was originally constructed in 1964. It is over 50 years old and the reservoir and its supporting utilities have reached the end of their useful life. The proposed new tank would be similar in style to the existing tank but 14 ft taller and about 25 wider in diameter. The project involves removal of the existing tank and construction of a 3.41 MG, 40-ft high, 155-ft diameter welded steel replacement reservoir on substantially the same footprint of the existing tank.",https://ceqanet.opr.ca.gov/2017072014,Dalton Reservoir Replacement Project (Project No. CIP 2016-19),Frank Guido,City of Livermore,N/A,,1052 S. Livermore Avenue,,Livermore,CA,94550,9259604476,37°43'49.2"N 121°43'55.8"W,Livermore,Alameda,,Ames St and Martingale Lane,94551,5.26,099b-5300-006-03,,Altamont Creek,,Yes,7/10/2017,8/8/2017,Water Facilities,Site Plan,"Aesthetics, Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services",,,,,,,,,,,,,,,,,