SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017062080,San Mateo County,,,Giannini Bridge Replacement,MND,8/17/2017,,"The applicant seeks a coastal development permit and grading permit for bridge repairs done in September 2015 and replacement of the bridge with a new 20-ft. wide free spanning bridge over Butano Creek on Giannini Ranch, owned by POST. The existing wood bridge will be demolished. The bridge site provides the only access to the agricultural fields on the west side of the segment of Butano Creek. Replacement of the bridge will restore brigde loading capacity necessary for agricultural operations. Construction of the new bridge includes new bridge supports (i.e. concrete abutments and wingwalls) to be constructed outward of top-of-bank and above the ordinary high and wingwalls) to be constructed outward of top-of-bank and above the ordinary high water line in order to minimize impacts to the creek. The project includes widening of the gravel roadway approaches to the bridge to conform to the new bridge width as well as the installation of a rock inlet at the existing storm drain, installation of swales, and placement of Class II aggregate base. A grading permit is required for 150 cy of cut and 400 cy of fill. No work is proposed to occur within Butano Creek and creek dewatering is not required to implement the project.",https://ceqanet.opr.ca.gov/2017062080/2,Giannini Bridge Replacement,Summer Burlison,San Mateo County,N/A,,"455 County Center, 2nd Floor",,Redwood City,CA,94063,6503631815,,,San Mateo,,Pescadero Creek Rd,94060,616.20,"086-270-010, 087-190-010",,Butano Creek,,No,8/17/2017,9/15/2017,Other,"Coastal Permit, Grading Permit","Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Tribal Cultural Resources, Wetland/Riparian",,,,,,,,,,,,,,,,,