SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017058360,Metropolitan Water District of Southern California,,,Palos Verdes Reservoir Piezometer Installation Palos Verdes Reservoir Piezometer Installation,NOE,5/18/2017,5/18/2017,Install seven piezometers along the northeast side of the Palos Verdes Reservoir.,https://ceqanet.opr.ca.gov/2017058360,Palos Verdes Reservoir Piezometer Installation Palos Verdes Reservoir Piezometer Installation,Michelle Morrison,Metropolitan Water District of Southern California,N/A,,P.O. Box 54153,,Los Angeles,CA,90054-0153,2132177906,,,Los Angeles,,,,,,,,,,,,,,,,,Categorical Exemption,"15303, 15306","The proposed project consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographic features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. The proposed project consists of construction and location of limited numbers of new, small facilities or structures; installation of small new equipment and facilities in small structures; and the conversion of existing small structures from one use to another where only minor modifications are made in the exterior of the structure. The proposed project consists of basic data collection, research, experimental management, and resource evaluation activities, which do not result in a serious or major disturbance to an environmental resource. These may be strictly for information gathering purposes, or as part of a study leading to an action, which a public agency has not yet approved, adopted, or funded.",,,,,,,,,,,,