SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017051059,"Temecula, City of",City of Temecula,,Pechanga Parkway Widening Project,MND,5/19/2017,,"The project proposes widening of Pechanga Parkway from four lanes to six lanes. The widening would occur along a segment of the existing roadway, spanning approx 3,500 ft, extending from approx 320 ft north of Via Gilberto to approx 320 ft south of North Casino Dr. The existing roadway includes four travel lanes in each direction, a landscaped center median, and left-hand turn lanes for access to Via Eduardo/Wolf Valley Rd, Casino Dr, and Pechanga Resort Dr. The existing roadway also includes a sidewalk throughout the project area, as well as bike lanes in both directions, with exception of along the southbound lanes along the frontage of the Pechanga Resort & Casino. The project also includes addition of new center median curb and landscaping; installation of a fiber optics cable; and, re-location of streetlights/traffic signals. The project also includes curb/gutter, sound wall, sidewalk, landscaping, irrigation, and storm drain improvements. The proposed roadway widening would expand the Pechanga Parkway Phase II improvements that occurred in 2009. The project is aimed at expanding existing improvements to alleviate traffic along Pechanga Parkway and to further the long-term transportation needs identified by the city's general plan.",https://ceqanet.opr.ca.gov/2017051059,Pechanga Parkway Widening Project,William Becerra,City of Temecula,N/A,,41000 Main St,,Temecula,CA,92590,9516933963,33°27'34.76"N 117°06'28.00"W,Temecula,Riverside,,Via Gilberto/North Casino Dr,92590,,,"SR 79, I-15",Temecula Creek; Wolf Creek Channel,,No,5/19/2017,6/19/2017,Other,General Plan Amendment,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,