SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017041072,Coachella Valley Water District,,CVWD,Addendum No. 1 to the Environmental Impact Report (EIR) for the Palm Desert Groundwater Replenishment Project,NOD,11/21/2019,11/21/2019,"This addendum analyzes the minor modification related to Phase 2 of the Palm Desert Groundwater Replenishment Facility Project ( certified EIR 2018); whereas minor revisions to the original design were required in order to comply with requests from permitting agencies and have been analyzed in this addendum. Design revisions for the project include: 1) relocation of the Mid-Valley Pipeline (MVP) Extension from the channel bed to the channel embankment; and 2) slope lining adjacent to Water Reclamation Plant No. 10 boundaries to protect the MVP Extension and allow low flows exceeding the capacity of the ponds to bypass the facility. These minor project changes have been analyzed under the provisions of CEQA consistent with the original EIR, and have been determined to result in no change to the significance of the impacts from the project",https://ceqanet.opr.ca.gov/2017041072/4,Palm Desert Groundwater Replenishment Project,Elizabeth Meyeroff,Coachella Valley Water District,N/A,,51501 Tyler St,,Coachella,CA,92236,7603982651,,Palm Desert,Riverside,,,,,,,,,,,,,,,,,,,,Coachella Valley Water District,Yes,11/12/2019,Yes,Yes,No,,Yes,Yes,Yes,Yes,"75-515 Hovley Lane East, Palm Desert, CA 92211."