SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017041061,"Fresno, City of",City of Fresno,,City of Fresno Northeast Surface Water Treatment Facility (NESWTF) Storage Tank Project Addendum to the Supplemental Mitigated Negative Declaration,NOD,8/21/2017,8/21/2017,"The City is proposing to refine the configuration of the previously approved facilities as analyzed in the certified Supplemental MND, which included changes to the existing overflow basin from an east-west alignment to a north-south alignment. The 6 million gallon (MG) water storage tank was proposed immediately to the east of the overflow basin. The current configuration would keep the existing overflow basin where it is currently located, but would move the location of the storage tank and associated infrastructure immediately south of the overflow basin, with a 10-foot high earthen berm to be constructed along the perimeter of the grove surrounding the tank. The storage tank would remain 6 MG in size but would extend farther into the existing grove than in the previously approved configuration. The current configuration may change slightly within the existing study area, and will result int he removal of the existing grove.",https://ceqanet.opr.ca.gov/2017041061/4,City of Fresno Northeast Surface Water Treatment Facility Storage Tank Addendum,Dejan Pavic,City of Fresno,N/A,,2101 G St,,Fresno,CA,93706,5596211620,,Fresno,Fresno,,North Chestnut Ave and East Behymer Ave,93730,,57802006T,,Enterprise Canal,,,,,,,,,,,,,City of Fresno ,Yes,8/3/2017,No,No,Yes,,Yes,,No,Yes,"2120 G Street, Fresno, CA 93706"