SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017038200,Energy Commission,California Energy Commission,,Recargo California Electric Highway,NOE,3/10/2017,3/10/2017,The project will deploy thirty-three electric vehicle charging stations in existing parking lots at eleven sites between the Oregon Border and Santa Rosa along US Highway 101 and at three sites between State Route 99 and Gilroy along State Route 152.,https://ceqanet.opr.ca.gov/2017038200,Recargo California Electric Highway,Thanh Lopez,California Energy Commission,N/A,,"1516 Ninth Street, MS-48",,Sacramento,CA,95814,9166543929,,,"Del Norte, Humboldt, Mendocino, Merced, San Benito, Sonoma",,,,,,,,,,,,,,,,,Categorical Exemption,"S:15301,2,3,4","The project is exempt because the electric vehicle chargers will be installed in existing parking lots involving negligible or no expansion of use, and may include alterations to existing mechanical equipment on the facility. There will be limited numbers of new, small electric vehicle chargers on the existing parking lot structure. The project includes replacement or reconstruction of existing utility system. All power will be provided from the existing electrical panel and the work includes installation of conduit, wiring, electrical connections and mounting equipment. Other activities may include minor alterations to land where minor trenching may be required to bring power from local sources to the proposed electric vehicle chargers, including backfilling where the surface is restored.",,,,,,,,,,,,