SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2017032018,Santa Clara Valley Water District,,,Coyote Warehouse Project,MND,3/3/2017,,"The District proposes to design, permit and construct the Coyote Warehouse Project on a parcel solely owned by the District adjacent to a parcel owned by the US Bureau of Reclamation, which includes the Coyote Pumping Plant. The project would consolidate and provide dedicated indoor and outdoor storage for District materials. The project would involve the new construction of an approx 32-ft high and 21,600 sf metal framed warehouse building. The foundation and sidewalls of the warehouse would be constructed of an 8-ft high concrete masonry units, with rib panel metal siding extending upward from the masonry unit forming the building's shell. The ribbed panel metal roof would cover the structure and be equipped with skylights.",https://ceqanet.opr.ca.gov/2017032018,Coyote Warehouse Project,Michael F. Coleman,Santa Clara Valley Water District,N/A,,5750 Almaden Expressway,,San Jose,CA,95118-3614,4086303096,37°09'34.8"N 121°38'13.6"W,Morgan Hill,Santa Clara,,"Mission Ave (site: Coyote Pumping Plant, 18300 Peet Road, Morgan Hill)",95037,8.23,728-340-08,"85, 87, US101, I-280, I-680",Coyote Creek,South County (San Martin),No,3/3/2017,4/3/2017,"Industrial, Other, Water Facilities","Site Plan, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,