SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016112006,"San Francisco, City and County of",City and County of San Francisco,,Southeast Plant (SEP) New Headworks (Grit) Replacement Project (CWWSIPSE02),NOD,3/3/2017,3/3/2017,"Notes: Per lead agency, title of NOD amended on 10/12/2017 The SF Public Utilities Commission is proposing the Southeast Plan (SEP) Headworks Replacement Project to modify and improve teh existing SEP preliminary treatment process facilities. The proposed project would consist of the following components (1) modifications to the Bruce Flynn Pump Station to be an all-weather pump station able to receive and pump all flow that is currently handled by the existing Southeast Lift Station; (2) demolition of the SEP 010 Influent Control Structure/Southeast Lift Station and construction of an odor control facility on the same site; (3) demolition of the existing SEP 011 and SEP 012 headworks and construction of a new 250-mgd Headworks Facility consisting of an influent junction structure, bar screen facility, grit tanks, primary influent distribution structure, process/operations control room, and electrical room; and (4) demolition of the unoccupied building adjacent to Bruce Flynn Pump Station at 398 Quint Street. Construction of the proposed project is expected to be completed in approx. 5 years, from 2017 to 2021. Construction staging would be located within the SEP, within Evans Street, in a lot adjacent to the Bruce Flynn Pump Station, adjacent to the SEP along Phelps Street, and potentially off site at the Pier 94 Backlands, Pier 94, and Pier 96. Construction activities would generally occur Monday through Friday, form 7:00 a.m. to 8:00 p/m., and Saturdays and Sundays as needed.",https://ceqanet.opr.ca.gov/2016112006/2,Southeast Plant Headworks Replacement Project,Timothy Johnston,City and County of San Francisco,N/A,,"1650 Mission St, Suite 400",,San Francisco,CA,94103,4155759035,37°44'41"N 122°23'31"W,San Francisco,San Francisco,,Evans Ave and Ranklin St,94124,,"5262/009, 5227/001","280, 101","SF Bay, Islais Creek",,,,,,,,,,,,,City and County of San Francisco ,Yes,2/28/2017,No,No,Yes,,Yes,,,,"1650 Mission Street, Suite 400, SF, CA 94103"