SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016098162,"High Speed Rail Authority, California",California High Speed Rail Authority,,Phase 2 Geotechnical Investigation - CA High-Speed Rail Project San Jose to Merced,NOE,9/9/2016,9/9/2016,"Activities include exploratory soil boring and cone penetrating test (CPT) sounding within public (Caltrans) rights-of-way. Truck-mounted equipment would drill 5- to 8-inch-diameter boreholes and perform CPTs, Peizometers might be installed for long-term groundwater monitoring.",https://ceqanet.opr.ca.gov/2016098162,Phase 2 Geotechnical Investigation - CA High-Speed Rail Project San Jose to Merced,Mark McLoughlin,California High Speed Rail Authority,N/A,,"777 L Street, Suite 800",,Sacramento,CA,95814,9164036934,,,Merced,,,,,,,,,,,,,,,,,Categorical Exemption,"15304, 15306 - Class 4 & 6","The project consists of geotechnical data collection that will not reslt in a significant effect on the environment because the soil boring will be performed on disturbed land surface in Caltrans ROW, will be temporary in duration, and the minor alteration to the land will be restored to its original surface condition.",,,,,,,,,,,,