SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016092058,"Weed, City of",City of Weed,,City of Weed Bypass Water Supply Pipeline Project Addendum No. 2 to the previously adopted Mitigated Negative Declaration,NOD,4/16/2018,4/16/2018,"The City of Weed adopted a MND for the Bypass Water Supply Pipeline Project On Dec. 8, 2016. Following adoption of the MND, the City determined that revisions to the project were required to ensure a safe and reliable water supply, and an Addendum (Addendum NO. 1) to the previously adopted MND was prepared. Following adoption of Addendum No. 1, geotechnical testing revealed that geological constraints would not allow trenchless installation of the pipe up School Hill as originally proposed, and the original alignment was too steep to allow safe installation with open-cut trenching. It was determined the pipe could be safely installed using open-cut trenching further north on School Hill. The modified alignment includes additional pipeline improvements in the road rights-of-way of Olive Street and/or E. Lake Street, Clay Street, E. Inez Street, and Butte Street. The subject properties are not included on any list of hazardous waste facilities/sites pursuant to Section 65962.5 of the CA Government Code.",https://ceqanet.opr.ca.gov/2016092058/5,Bypass Water Supply Pipeline ,Ron Stock,City of Weed,N/A,,550 Main St.,PO Box 470,Weed,CA,96094,5309385020,41°25'26"N 122°22'48"W,Weed,Siskiyou,,Various,96094,,various,"5,97, 265","Boles Creek, Beaughton Creek, Black Butte Spring, etc.",,,,,,,,,,,,,City of Weed City Council ,Yes,4/12/2018,No,No,Yes,,Yes,,No,Yes,"550 Main St., Weed, CA 96094"