SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016092008,Amador Water Agency,,AWA,Central Amador Water Project Water Right Application,NOP,9/2/2016,,"AWA is requesting a water right permit to store up to 1,400 acre-feet per year (AFY) in Lower Bear River Reservoir and to directly divert up to 1,050 AFY of water that is currently diverted by Jackson Valley Irrigation District (JVID) further downstream. The permit would allow: 1) increase maximum rates of direct diversion allowed from the Bear River and North Fork Mokelumne River from 3 cubic feet per second to 5 cfs., with combined rates between these sources not to exceed 5 cfs; 2) increase the amount of water that may be diverted into storage annually at Lower Bear River Reservoir from 1,600 AF to 3,000 AF; and 3) increase the amount of water that may be beneficially used annually, whether by direct diversion or re-diversion of water released from storage, from 1,150 AF to 2,200 AF. The diversion would use existing facilities; no new construction is needed.",https://ceqanet.opr.ca.gov/2016092008,Central Amador Water Project Water Right Application,Gene MAncebo,Amador County Water Agency,N/A,,12800 Ridge Road,,Sutter Creek,CA,95685,2092233018,,,Amador,,,,,,"88, 26","Mokelumne River, Bear River, Tiger Creek, Cole Creek",,Yes,9/2/2016,10/3/2016,Other,,"Cumulative Effects, Growth Inducement, Hydrology/Water Quality, Wildfire",,,,,,,,,,,,,,,,,