SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016091071,Monterey Peninsula Water Management District,,,Addendum to Mitigated Negative Declaration for Sleepy Hollow Steelhead Rearing Facility Upgrade,NOD,7/20/2018,7/20/2018,"District proposes to upgrade the Sleepy Hollow Steelhead Rearing facility to improve water supply intake reliability and intake water quality. The project includes integrating or modifying existing systems to rear juvenile steelhead to work with proposed improvements. Specific tasks include: removing an existing water intake structure in the bed of the Carmel River; installing a new intake structure and screen in the bed of the Carmel River; piping and other improvements to deliver water from the river to the facility; and constructing a recirculating aquaculture system in the floodplain adjacent to the active channel of the Carmel River to provide water clarification and filtration. Project construction is anticipated to be phased, likely beginning in early 2017 and to be completed in 2019.",https://ceqanet.opr.ca.gov/2016091071/4,Sleepy Hollow Steelhead Rearing Facility Raw Water Intake and Water Supply System Upgrade,Larry Hampson,Monterey Peninsula Water Mgt. Dist.,N/A,,P.O. Box 85,,Monterey,CA,93942,8316585620,36°26'36.63"N 121°42'57.51"W,,Monterey,,~1 mile downstream of the former San Clemente Dam location,93924,3.2,417051004000,,Carmel River,,,,,,,,,,,,,Monterey Peninsula Water Management District ,Yes,7/16/2018,,No,No,,No,,,Yes,"5 Harris Court, Bldg. G, Monterey, CA 93940"