SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016091009,"Pasadena, City of",City of Pasadena,,ArtCenter College of Design Master Plan,NOD,9/10/2018,9/10/2018,"ArtCenter College of Design proposes a two phase 15-year Master Plan. Upon completion, total enrollment would increase from 2,500 full-time equivalent students to 2,500 FTE students and increase faculty/staff from 753 to 994 between the two campuses. South Campus; Phase 1 - construction of two eight-story, 100-foot tall buildings for academic programs and student housing; elevated open ""quad"" area over the Metro Gold Line; mobility hub below the quad area; renovation and internal floor area addition to an existing two-story building; renovation of an existing six-story building for academic purposes, and installation of an 8,000 square foot digital gallery on southeastern facade of 1111 S. Arroyo Pkwy. South campus Phase II - demolition of a one-story building and construction of four eight-story, 100-foot tall, buidings for academic programs and/or student housings and elevated ""quad"" area. Hillside Campus, Phase I- demolition, renovations and additions to existing buildings; installation of photovoltaic solar canopies on the existing parking lots; modifications to the parking and circulation plan. Hillside Campus Phase II - reconstruction and additions to the maintenance building. No development is proposed on the undeveloped portions of the hillside campus.",https://ceqanet.opr.ca.gov/2016091009/6,ArtCenter College of Design Master Plan,David Sinclair,City of Pasadena,N/A,,175 N. Garfield Avenue,,Pasadena,CA,91101,6267446766,34°07'37.38"N 118°08'56.62"W,Pasadena,Los Angeles,,"Hillside campus: 1700 Lida Street/ South Campus South Raymond Ave, South Arroyo Parkway",91103,"6.68, 155.95","5720-007-023, 5720-007-025, 5720-007-026, 5720-008-011, 5720-008-012, 5705-002-006","I-210, SR-110, SR-2",,,,,,,,,,,,,,City of Pasadena ,Yes,7/16/2018,No,Yes,No,,Yes,,No,Yes,