SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016091009,"Pasadena, City of",City of Pasadena,,ArtCenter College of Design Master Plan,NOP,9/2/2016,,"ArtCenter was first established in Los Angeles in 1930 and moved to its current Hillside Campus (at 1700 Lida Street) in the City of Pasadena in 1976. In 2004, ArtCenter established a second campus also in Pasadena, referred to as the South Campus (at 950 S. Raymond Avenue). As the South Campus has grown and operations have shifted to this campus over time, the Hillside Campus and the south Campus have become increasingly connected. As a result, the Art Center has submitted one Master Plan application for a new 15-year Master Plan (the Project) that encompasses development on and comprehensively identifies vision for both the Hillside Campus and the South Campus. ArtCenter would focus growth on its South Campus, while providing for infrastructure improvements and building renovations to existing buildings, additional parking, installation of photovoltaic (PV) solar cells, and modifications to campus access. The Project would be implemented in two phases, with Phase I occurring between 2017 and 2022 and Phase II occurring between 2022 and 2032. It is anticipated that upon completion of the project, total enrollment within ArtCenter would increase from its current enrollment of approx. 2,000 full-time equivalent (FTE) students to a maximum of 2,500 FTE students and increase faculty/staff from 753 faculty/staff members to approx. 994 faculty/staff members between the two campuses.",https://ceqanet.opr.ca.gov/2016091009,ArtCenter College of Design Master Plan,Ha Ly,City of Pasadena,N/A,,175 N. Garfield Avenue,,Pasadena,CA,91101,6267446743,34°07'37.38"N 118°08'56.62"W,Pasadena,Los Angeles,,Arroyo Pkwy/Glenarm St. (South Campus); Lida St./ Linda Vista Ave. (Hillside Campus),91103,"6.68, 155.95","5720-007-023, 5720-007-025, 5720-007-026, 5720-008-011, 5720-008-012, 5705-002-006","I-210, SR-110, SR-2",,,Yes,9/2/2016,10/3/2016,"Educational, Other","Land Division (Subdivision, etc.), Master Plan, Rezone","Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Sewer Capacity, Solid Waste, Transportation",,,,,,,,,,,,,,,,,