SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016082063,Sacramento County,,,Mather Dam Improvements Project (Lake and Streambed Alteration Agreement No. 1600-2016-0241-R2),NOD,5/25/2017,5/25/2017,"CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2016-0241-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sacramento county. The project is limited to the removal and replacement of Mather Dam spillway. The existing main spillway is made up of 8 pipes (2 concrete pipes and 6 corrugated metal pipes). The spillway outfall area within Morrison Creek is currently made up of an old concrete apron and concrete rubble. Exposed portions of the creek channel in this location are damaged by scour, and it appears the concrete rubble has been placed within the channel as an attempt to prevent further scour damage. This culvert-style spillway and concrete outfall structure within Morrison Creek will be replaced with a new concrete, broad crested weir outfall structure and a permanent pedestrian/vehicle bridge. The new spillway will be 1.5 feet lower than the existing spillway. The new rectangular spillway channel and weir will be approx. 16 feet wide and 45 feet long. ",https://ceqanet.opr.ca.gov/2016082063/5,Mather Dam Improvements Project,Tanya Sheya,CDFW,N/A,,"1701 Nimbus Road, Suite A",,Rancho Cordova,CA,95670,9163582953,38°33'22.28"N 121°15'32.71"W,Rancho Cordova,Sacramento,,Douglas Rd/Zinfandel Dr,95655,5.2,067-0030-072-000,,Morrison Creek,,,,,,,,,,,,,CDFW ,No,5/22/2017,No,No,Yes,,Yes,,No,No,"1701 Nimbus Road, Suite A, Rancho Cordova, CA 95670"