SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016078373,Energy Commission,California Energy Commission,,"American Water Works Company, Inc.",NOE,7/29/2016,7/29/2016,"The purpose of this project is to fund the demonstration of three leak detecting technologies that can reduce the amount of water lost from leaking municipal piping. The three technologies being demonstrated are correlating continuous acoustic monitoring, satellite imagery leak detection, and flow sensitive pressure reducing valves.",https://ceqanet.opr.ca.gov/2016078373,"American Water Works Company, Inc.",Kevin Mori,California Energy Commission,N/A,,"1516 Ninth Street, MS-48",,Sacramento,CA,95814,9163271475,,"Duarte, San Diego, Ventura","Los Angeles, San Diego, Ventura",,,,,,,,,,,,,,,,,Categorical Exemption,"S:15301,15306","15301 provides that projects which consist of the operation repair, maintenance, or minor alteration of existing public or private structures, facilities, or mechanical equipment, and which involve negligible or no expansion of use beyond that existing at the time of the lead agency's determination, are categorically exempt from the provisions of the CEQA.",,,,,,,,,,,,