SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016068508,Fish & Wildlife 3 (Napa),"California Department of Fish and Wildlife, Region 3",CDFW,Olive Hill Pipeline Project,NOE,6/30/2016,6/30/2016,"The project is part of a larger project which involves the installation of 4,400 lf of 12-in ductile iron pipe along the public ROW in Canada Road for the conveyance of potable water to residents. The project covered under the Lake and Streambed alteration agreement no. 1600-2015-0301-R3 CDFW is executing pursuant to section 1602 fish and game code, covers only the segment of pipeline installed by trenching underneath the asphalt layer of Dry Creek Bridge. The pipeline will be a 12 in cement lined and coated steel pipe approximately 25 ft long. Concrete structural piers will be installed on either side of the creek bank approximately down to 20 ft below the creek bed. The CL&C pipeline will be attached along a steel beam crossing under the roadway of the bridge above the culverts and supported on either side by the concrete structural piers. The trench will be backfilled and patchpaved after the pipe is installed.",https://ceqanet.opr.ca.gov/2016068508,Olive Hill Pipeline Project,Suzanne DeLeon,"California Department of Fish and Wildlife, Region 3",N/A,,7329 Silverado Trail,,Napa,CA,94558,8314409433,,Woodside,San Mateo,,,,,,,,,,,,,,,,,Categorical Exemption,"15301, 15304",Project includes replacing the pipeline for safe and adequate delivery of potable water by trenching and trench surfaces will be restored.,,,,,,,,,,,,