SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016062053,"Menlo Park, City of",City of Menlo Park,,Middle Plaza at 500 El Camino Real Project,NOP,6/22/2016,,"Stanford University (Project sponsor) is proposing to redevelop six parcels of land along the east side of El Camino Real into a mixed-use development. The Caltrain right-of-way is located to the east of the Project Site. The Project would demolish the existing structures and construct up to 459,013 square feet of mixed uses at the Project Site. The publicly accessible plaza at the Project site would be approximately 120 feet wide and approximately 0.5 acre in size. The six new buildings would include approximately 305,000 sf of residential space (215 housing units); 144,000 sf of non-medical office space; and 10,000 sf of ground floor retail/restaurant space. The Project would provide approximately 1,005 parking spaces through underground parking garages and surface parking, although reduced parking may be considered through a shared parking study.",https://ceqanet.opr.ca.gov/2016062053,Middle Plaza at 500 El Camino Real Project,Jean Lin,City of Menlo Park,N/A,,701 Laurel Street,,Menlo Park,CA,94025,6503306735,37°27'00N"N 122°10'31W"W,Menlo Park,San Mateo,,"Middle Avenue, College Avenue, Partridge Avenue, El Camino Real",,8.4,"071-440-060,-120,-050,-030","82, US101",,,Yes,6/22/2016,7/21/2016,"Commercial, Office, Other, Residential","Land Division (Subdivision, etc.), Site Plan","Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Social, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,