SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016041072,United Water Conservation District,,,Piru Spreading Grounds Solar Project,OTH,7/1/2016,,"Note: Response to Comments The proposed project is a fenced and gated 2.0 MW alternating current (MW-AC) or 2.4 MW direct current (MW-DC) solar photovoltaic (PV) energy generation facility. The facility would consist of 5,780 photovoltaic modules, 1,192 piers, 8 drive motors, and 24 combiner boxes. The facility would be connected to Southern CA Edison's electricity grid at the existing utility pole location on CA-126 (Pole ID No. 4215667F) via an underground utility trench approximately 795 lf in length. To support the additional load, the existing wood utility pole would be replaced with a steel pole. Solar panels would occupy approximately 12 acres of the 21.52 acre site and would have a max height of 10 ft and would be mounted on piers. The project would also include perimeter fencing, access gate, and 12 ft wide maintenance and access road.",https://ceqanet.opr.ca.gov/2016041072/2,Piru Spreading Grounds Solar Project,James Grisham,United Water Conservation District,N/A,,106 N. 8th Street,,Santa Paula,CA,93060,8055254431,34°24'21.86"N 118°47'25.6"W,,Ventura,,CA 126/ Main St,93060,21.51,057-0-020-145,CA 126,"Santa Clara River, Piru Creek",,No,,,Power,Site Plan,Biological Resources,,,,,,,,,,,,,,,,,