SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016039008,"Forestry and Fire Protection, Department of",California Department of Forestry and Fire Protection,CAL FIRE,Streambed Alteration Agreement No. 1600-2015-0248-R2 "Veal" THP,NOD,3/28/2016,3/28/2016,"CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0248-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sierra Pacific Industries, or Mr. Frank Mulhair acting on behalf of project Applicant. The project entails two options for a temporary Class I watercourse crossing, dependent upon streamflow conditions the year of, and during timber operations: 1. The installation of a temporary low profile crossing consisting of a series of shallow troughs (3 to 6), oriented parallel to streamflow, followed by the installation of 8 inch to 10 inch corrugated metal pipes (CMP) set within each of the troughs. The number of troughs/CMP's to be installed will be dependent upon streamflow present at time of operations. A sufficient number of CMP's will be installed to adequately convey streamflow. Upon completion of use, the CMP's shall be pulled and the channel restored to allow unimpeded flow and to bring the channel to pre-project conditions, to the extent feasible. 2. Should the watercourse remain completely dry during timber operations, the Permittee may choose to use the existing ford crossing. If this option is employed, the channel will be shaped to accommodate truck traffic. No fill will be imported into or placed within the Watercourse and Lake Protection Zone (WLPZ) of the watercourse. Clean, angular 1.5 inch to 6 inch rock, devoid of fines, will be utilized as a runnign surface over the crossing. Regardless of either option, approaches will be rocked for a minimum of 25 feet from either side of the high water mark of the crossing. Further info can be found in the THP 4-12-022-CAL. ",https://ceqanet.opr.ca.gov/2016039008,Streambed Alteration Agreement No. 1600-2015-0248-R2 "Veal" THP,Caroline Petersen,CDFW,N/A,,"1701 Nimbus Road, Suite A",,"Rancho Cordova, CA 95670",CA,95670,9163581163,,,Calaveras,,,,,,,,,,,,,,,,,,,,CDFW ,No,3/21/2016,No,No,No,,Yes,,No,No,"1701 Nimbus Road, Suite A, Rancho Cordova, CA 95670"