SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016038045,Energy Commission,California Energy Commission,,Renewable Microgrid for a Medical Center,NOE,3/2/2016,3/2/2016,"Install renewable-based micro-gold at the Kaiser Permanente facility in Richmond, California. The microgrid consists of a 250kW rooftop and carport canopy photovoltaic system, 250 kW power conditioner, 1 MWh battery energy storage, and a microgrid controller. The microgrid will support critical hospital system by providing at least three hours of power during a utility outage and participating in automated demand response to reduce electrical demand.",https://ceqanet.opr.ca.gov/2016038045,Renewable Microgrid for a Medical Center,Consuelo Sichon,California Energy Commission,N/A,,"1516 Ninth Street, MS-48",,Sacramento,CA,95814,9163272222,,Richmond,Contra Costa,,,,,,,,,,,,,,,,,Categorical Exemption,"15303, Class 3","New construction of limited small new facilities; installation of small, new equipment and facilities in small structures; and conversion of the use of small existing strucutres (e.g., construction of three or fewer single-family homes in urban areas).",,,,,,,,,,,,