SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016028010,San Diego Unified Port District,,,"Right of Entry Permit to Bluewater Marine and Dock Specialties, Inc. for Staging and Parking for the Construction and Replacement of Docks",NOE,2/1/2016,2/1/2016," The proposed project is a Right of Entry Permit (ROE) to Bluewater Marine and Dock Specialties, Inc. (Permittee) to enter properly located at the southwest corner of Anchorage Lane and Shelter Island drive in the City of San Diego. The land (Parcel No. 1) and water (Parcel No. 2) area proposed for use under this ROE would be used by the Permittee and the Permittee's authorized agent(s) and contractors(s) for the purpose pf providing staging and parking for the construction and replacement of docks at Humphrey's Half Moon Inn & Suites Marina, as well as ingress and egress in support of those activities. Parcel No. 1 occupies approximately 4,786 square feet of land area, including 11 metered parking spaces, in the southwest portion of an existing 60-space metered parking lot. Parcel No. 1 would be used for worker parking and the staging of equipment and materials, including, but not limited to, docks and a small crane. Parcel No. 2 occupies approximately 251 sf of water area adjacent to Parcel No. 1. An approximately 8-foot-wide by 30-foot-long floating dock would be temporarily anchored within Parcel No.2, which would provide a stable platform for workers to use during the transfer of docks from the land to the water and form the water to the land. The Permittee would be responsible for compliance with all laws and regulations associated with the activities on or in connection with the above-described premises, including hazards and hazardous materials, storm water, and water quality.",https://ceqanet.opr.ca.gov/2016028010,"Right of Entry Permit to Bluewater Marine and Dock Specialties, Inc. for Staging and Parking for the Construction and Replacement of Docks",Levi Lantz,San Diego Unified Port District,N/A,,Land Use Planning Department,P.O. Box 120488,San Diego,CA,92112-0488,6196866646,,San Diego,San Diego,,Anchorage Lane and Shelter Island Drive,,,,,,,,,,,,,,,Categorical Exemption,"S:15301,2,4;15311 C:1,2,4,11","The project is determined to be Categorically Exempt pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15301 (Existing Facilities) and/or 15302 (Replacement or Reconstruction) and Sections 3.a (9) and/or 3.b (2) of the District's Guidelines for compliance with CEQA because it is the repair and replacement of an existing deck that would involve no expansion of use beyond that previously existing, would be located on the same site, and have substantially the same purpose and capacity as the structure being replaced",,,,,,,,,,,,