SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016028004,Fish & Wildlife 2 (Rancho Cordova),"California Department of Fish and Wildlife, Region 2",CDFW,Allen Myers Drainage Pump Project (Streambed Alteration Agreement No. 1600-2015-0184-R2),NOE,2/1/2016,2/1/2016,"The California Department of Fish and Wildlife has executed Streambed Alteration Agreement number 1600-2015-0184-R2, pursuant to Section 1602 of the Fish and Game Code to Allen Myers. The project consists of the installation of new 118 (ft.) long, 18-inch (in) steel epoxy coated pump discharge pipe approximately 6-inch higher on the levee than the existing culvert. The new steel pipe will convey water from a lift pump within the retention ditch to Freshwater Creek. The project will also include the installation of an 18-in positive closure device and siphon breaker. A 17-ft long section of the steel pipe will convey water in the existing concrete structure above the ordinary high water mark on the bank of Freshwater Creek. Once installed water from the steel pipe will discharge into the existing concrete water structure located within the Creek; therefore erosion of the creek banks will not occur. Approximately 30 cubic yards of native fill on the level with be disturbed in order to install the new culvert pipe. After the pipe is installed, all disturbed soil including the banks of Freshwater Creek will be compacted to the Department of Water Resources levee compaction standards using a vibratory plate compactor. The existing 24-in culvert pipe within the levee will continue to act as a gravity fed drain.",https://ceqanet.opr.ca.gov/2016028004,Allen Myers Drainage Pump Project (Streambed Alteration Agreement No. 1600-2015-0184-R2),Kursten,"California Department of Fish and Wildlife, Region 2",N/A,,Northern Central Region,"1701 Nimbus Road, Suite A",Rancho Cordova,CA,95670,9163582950,,,Colusa,,,,,,,Freshwater Creek,,,,,,,,,,Categorical Exemption,S:15301,This project involves a replacement of an existing structure and does not impact special status species or the habitat on which they depend.,,,,,,,,,,,,