SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2016028001,Fish & Wildlife 1 (Redding),"California Department of Fish and Wildlife, Region 1",CDFW,Sacramento River Geotechnical Investigation Project (Lake or Streambed Alteration Agreement No. 1600-2015-0462-R1),NOE,2/1/2016,2/1/2016,"The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement number 1600-2015-0462-R1, pursuant to Section 1602 of the Fish and Game Code to California Department of Transportation. The project designed to acquire information on the physical properties of the rock and sediments of the Sacramento River bed channel along the north and south bound bridges of I-5. Approximately 18 bore holes will be drilled or hammered to a depth of approximately 150-200 feet using ad rill of 4 inches in diameter within a casing of 6 inches in diameter. Twelve of the 18 borings will be within the Ordinary High Water Mark (OHWM) and six will be on the banks outside the OHWM. Boring activities are planned to occur between Jan. 1, 2016 and March 31, 2016 (preferred work window) or June 1 to July 1 as a secondary backup work window. Each bore hole is expected to take two to three days to complete. Boring in the river will be performed by equipment mounted on a barge or other floating platform which will be anchored to the river bed. Boring outside the OHWM will be performed using truck mounted drilling equipment. ",https://ceqanet.opr.ca.gov/2016028001,Sacramento River Geotechnical Investigation Project (Lake or Streambed Alteration Agreement No. 1600-2015-0462-R1),Richard Lis,"California Department of Fish and Wildlife, Region 1",N/A,,Northern Region,601 Locust Street,Redding,CA,96001,5302252142,,Red Bluff,Tehama,,,,,,,,,,,,,,,,,Categorical Exemption,S:15306 C:6,This project meets the exemption because it is collecting data on sediments rock composition beneath the Sacramento River. This information will be used as part of a study to potentially enlarge or replace the Interstate 5 bridge over the Sacramento River at this location.,,,,,,,,,,,,